JFSA prepared utility design for storm sewer,
sanitary sewer, domestic (fire) water line, gas/electric coordination, TCI coordination, and U.S. West coordination. The drainage
design included floodplain analysis, detailed study, and construction
documents for the facility. JFSA also prepared plans for removal
and abandonment and construction phasing of infrastructure
to serve the project. The relocated sanitary sewer interceptors
were 72" and 36" in diameter. These interceptors
were designed and constructed without interruption of service.
The two box culverts outfalling on the South Platte River
were 10'x3'. Scope included management, specifications, bidding
assistance, coordination, design, and construction administration.
Reference: HNTB Sports Entertainment, Heather Reavy 303.839.8300