44 Mile Fresh Water Pipeline Survey
Hays, Kansas
Section Breakdown / Control Network
JFSA was required to breakdown several sections of land to complete the control
network and easement portion of the proposed 44-mile fresh water pipeline. Using Original BLM field notes and local
entities, our team located eighty-six land corners across 7 ranges. Our team used GPS fast static methods to create
a control grid being 44 miles long by 7 miles wide. After the final design has been completed JFSA will rehabilitate,
upgrade and or set all land corners used for control.
Reference: Black and Veatch, David C. Vidikan, P.E., 303.671.4200
|
|
|
| |
|
| |
|
|