J.F. Sato and Associates was recently selected by the DWD to carry out a study on the migration of sediment
in the Roberts Tunnel. This 10.25 ft diameter tunnel has a
capacity of 1020 cfs and supplies a significant portion of
the raw water for the metro Denver area. The source of the
sediment is to be determined and alternatives developed to
prevent sediment from entering the tunnel. We will also pre-design
a method to trap any sediment that may enter from uncontrolled
sources before it can cause damage to the hydroelectric turbine
or control valves located at the end of the tunnel.
Reference: Susan Denver Water Department, Steele Weir 303.626.6616